Tiling
Projects
Midnight Hotel – ACT
Head Builder: Geocon
POD Manufacturer: Sync
Architect(s)/Consultant(s): Fender Katsalidis
Project details:
Located in the inner-city suburb of Braddon, ACT, the Midnight Hotel is a 5-star luxury hotel offering 199 guest rooms, restaurant, bar, gym, sauna, indoor pool, meeting and events space. The 183 bathroom pods will feature matt black wall tiles and grey floor tiles, Polytec Ravine Wenge bench tops, LED strip lighting, and mirrored splashbacks.
Challenge:
Sitting on a smaller than average sized site with fast turnaround times required for the bathroom pod construction process, a tiling system with excellent workability and ease of application was needed.
Solution:
ARDEX were able to offer the complete tiling solution consisting of ARDEX X 17 tile adhesive and ARDEX FSDD grout. The 183 architecturally designed bathroom pods were integrated throughout every guest room in the hotel, and simply installed and connected once they arrive on site ensuring project scheduling was met.
Unique Elements:
ARDEX provided the tiling solution, accompanied by market leading service and technical support throughout the entire project. The project remained on schedule and guaranteed the products performance characteristics met the projects requirements.
Products Specified for this project
-
ARDEX FS-DD
Non-Sanded Cement-Based, Wall and Floor Grouting Compound
- Water repellent due to special hydrophobing agent
- Dirt Resistant – Longer lasting new look, as dirt is unable to enter grout
-
ARDEX X 17
Flexible Non-Slump Wall and Floor Tile Adhesive
- Non slump – ideal for large format and heavy tiles
- Great workability with low sand content
More projects in Tiling
-
AURA, Sydney
This contemporary luxury apartment project highlights trusted performance and industry-leading service and warranty
-
Wai Ariki Hot Springs and Spa, Lake Rotorua, New Zealand
Luxury hot springs and spa situated on captivating shores
-
Olympic Aquatic Centre, London
Fit For Purpose: London 2012 Olympic Games
-
Therme Lindau, Germany
On one of the most beautiful stretches of Germany’s Lake Constance, nestles wellness oasis Therme Lindau whose seemingly floating design took an expert team 16 months to fulfill the architect’s vision.
-
Holiday Inn Express Hotel – VIC
312 bathroom pods
-
Iglu Student Accommodation – VIC
594 bathroom pods with six different typologies
-
Mercure Hotel – VIC
166 bathroom pods
-
Midnight Hotel – ACT
183 architecturally designed bathroom pods
-
Vibe Hotel – TAS
132 architecturally designed bathroom pods
-
West Village – West End QLD
Office suites and apartments across multiple residential towers
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
Crystallbrook Bailey
Crystalbrook Bailey, Cairns, QLD (Luxury Hotel & Residences)
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
Miami Aquatic Centre, Miami, Gold Coast
Renovation on 40+ year aquatic facility installed with ARDEX tiling system
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Austin Apartment Pool Refurbishment, South Brisbane
ARDEX system specified to refurbish tiles that have lost adhesion in a pool
-
Mercedes Benz Autohaus, Newstead
ARDEX system specified for unique 32,000 sqm auto dealership
-
Cairns Corporate Tower, Cairns
ARDEX system specified to rejuvenate a building that posed unique challenges
-
Perth Children’s Hospital
ARDEX system specified for high-profile Government project.
-
Optus Stadium, Perth
SystemARDEX specified for high end Government project
-
Harbour Town Eats, Gold Coast
External tiling system specified in the worlds largest installation of Flexbone.
-
Heirloom Apartments, Fremantle
ARDEX waterproofing and tiling systems used in heritage listed building.
-
Marina Square, Wentworth Point
ARDEX tiling and grouting system used in major shopping centre.
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
Oracle Apartments, Broadbeach
SystemARDEX specified in large redevelopment project.
-
Ocean Marina Pointe Apartments, Mandurah
ARDEX adhesive used in Mandurah apartments upgrade
-
International Airport, Canberra
Canberra Airport upgrade
-
Airport, Newcastle
1600 sqm of natural stone laid using ARDEX adhesives
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Opera House Western Foyer, Sydney
ARDEX adhesive, grout and primer used at Sydney Opera House
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
Lightning Ridge Olympic Pool
ARDEX tiling system specified for pool complex renovation
-
The Canberra Centre, Canberra
ARDEX adhesive used in large upgrade of The Canberra Centre
-
Warnbro Shopping Centre, Warnbro
ARDEX system specified in time critical project
-
The Emporium, Melbourne
21,000 sqm of tiling completed using ARDEX adhesive and grout
-
Old Parliament House, Canberra
ARDEX products were specified and used throughout the project
-
Lure Apartments, Nelson Bay
ARDEX sound proofing system used in new prestigious development
-
Elevation Apartments, Perth
ARDEX System used in prestigious development right in the heart of Perth’s CBD
-
215 Adelaide Street, Brisbane
Refurbishment of office tower complex
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
The Vibe Hotel, Canberra
5000 sq. metres of ARDEX tile adhesive was used for The Vibe Hotel
-
Science Centre, Brisbane
The ARDEX range of compatible technologies were used in this major redevelopment