West Village – West End QLD
Head Builder: Hutchinson Builders
POD Manufacturer: Hutchinson Builders
Architect(s)/Consultant(s): Hayball, ACME & Co and Netteltontribe
Project details:
The major redevelopment of the Peters Ice Cream Factory in West End is bringing life to this iconic area. With office suites, apartments across multiple residential towers, heritage restoration, new Peters Lane retail precinct, and right through to the latest 5 Star Green Star Greenhouse office building.
Challenge:
With fast turnaround times required for the bathroom pod construction process, a trusted waterproofing and tiling system with excellent workability and ease of application was needed for the 473 bathroom pods spanning across 332 apartments.
Solution:
ARDEX were able to offer the complete waterproofing and tiling solution consisting of ARDEX WPM 155 Rapid Plus waterproofing membrane, ARDEX X 18 tile adhesive, and ARDEX FSDD grout and ARDEX SE Silicone. The 473 bathroom pods were integrated throughout every bathroom in the residential towers, and simply installed and connected once they arrive on site ensuring project scheduling was met.
Unique Elements:
ARDEX provided the tiling solution, accompanied by market leading service and technical support throughout the entire project. The project remained on schedule and guaranteed the products performance characteristics met the projects requirements.
Products Specified for this project
-
ARDEX WPM 155 Rapid Plus
Professional Engineered Undertile Membrane
- Express Dry Time - Tile bathrooms in 4 hours
- Crack Isolation protection
-
ARDEX X 18
Fibre Reinforced Flexible Non Slump Wall and Floor Tile Adhesive
- Fibre reinforced for extra strength and peace of mind
- Excellent workability with low sand content
-
ARDEX FS-DD
Non-Sanded Cement-Based, Wall and Floor Grouting Compound
- Water repellent due to special hydrophobing agent
- Dirt Resistant – Longer lasting new look, as dirt is unable to enter grout
-
ARDEX SE
Flexible Sealant for use in Tile Movement Joints
- Flexible sealant for use in tile movement and connecting joints
- Elastic – withstands 25% total movement of original joint width
More projects in Leisure
-
Nan Tien Temple, NSW
Largest Buddhist temple in the southern hemisphere
-
Burj Khalifa – Middle East
Burj Khalifa is the tallest building in the world
-
Holiday Inn Express Hotel – VIC
312 bathroom pods
-
Iglu Student Accommodation – VIC
594 bathroom pods with six different typologies
-
Mercure Hotel – VIC
166 bathroom pods
-
West Village – West End QLD
Office suites and apartments across multiple residential towers
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
Crystallbrook Bailey
Crystalbrook Bailey, Cairns, QLD (Luxury Hotel & Residences)
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
Miami Aquatic Centre, Miami, Gold Coast
Renovation on 40+ year aquatic facility installed with ARDEX tiling system
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Austin Apartment Pool Refurbishment, South Brisbane
ARDEX system specified to refurbish tiles that have lost adhesion in a pool
-
Optus Stadium, Perth
SystemARDEX specified for high end Government project
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Opera House Western Foyer, Sydney
ARDEX adhesive, grout and primer used at Sydney Opera House
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
Lightning Ridge Olympic Pool
ARDEX tiling system specified for pool complex renovation
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
The Vibe Hotel, Canberra
5000 sq. metres of ARDEX tile adhesive was used for The Vibe Hotel