Hoppers Crossing Warehouse
INSTALLER/APPLICATOR: Bravada Waterproofing
GENERAL CONTRACTOR: Bravada Waterproofing
CHALLENGE:
50 linear metres of injection to multiply panels
100 linear metres of cosmetic repair using ARDEX RA 88
Timeline concerns (fast turnaround); painting had already commenced
Scissor lift access, difficulty working around fixed equipment (T-Port application)
Multiple tenancies
PROBLEM/ SITUATION:
Structural repair and cosmetic repair to concrete tilt panels. Panels had cracked due to land settlement and had become apparent to building tenants due to leaks coming into the building. Engineering assessment conducted and advised cracks requiring injection and cosmetic defects.
SOLUTION:
Ronald Rose (Vic Sales Manager) was initially contacted by the owner of the building via an enquiry from ARDEX Technical Services, due to his extensive knowledge gained whilst working for ARDEX New Zealand after the Christchurch earthquakes, to conduct a site visit and ascertain if ARDEX products were suitable.
A recommendation was given that repairs could proceed with the ARDEX Crack Repair and Injection System; however, an engineer’s assessment was required on cracks that were substantial. The asset owner engaged engineers and it was identified which cracks required structural injection using ARDEX RA 142, 144 and 146 and which only required aesthetical repairs with ARDEX RA 88. Bravada were engaged after an ARDEX recommendation to carry out the repairs. Due to electrical conduits and pallet racking in place on a number of walls in the varying tenancies, ARDEX RA 146 Blindside Concrete Crack Injection Epoxy Gel was chosen for these areas as the injection material due to the ability to be blindside injected.
UNIQUE ELEMENTS:
Scope of works provided onsite to Bravada team members on products to be used and where.
Using ARDEX RA 146 Blindside Concrete Crack Injection Epoxy Gel
Fast cure of ARDEX RA 88 allowed porting and injecting on the same day
Tech support onsite for initial start-up and routine visits from ARDEX representatives throughout the project
Onsite training provided to new staff members of the contractor
External painting project was not delayed and was able to be completed with minimal disruption to building occupants
Products Specified for this project
-
ARDEX RA 88 PLUS
Multi-Purpose Epoxy Repair Adhesive
- Non-sag - Perfect for overhead and vertical repairs
- High strength - Stronger than concrete > 55Mpa
-
ARDEX RA 142
Super Low Viscosity Structural Concrete Crack Injection Epoxy
- Very thin liquid for superior crack penetration
- Epoxy resin binder for epoxy mortar patching and overlay of interior surface using addition of aggregate
-
ARDEX RA 144
Low Viscosity Structural Concrete Crack Injection Epoxy
- Pressure injection and gravity feed structural crack repair in horizontal concrete, masonry for cracks from 3mm to 6mm
- Epoxy resin binder for epoxy mortar patching and overlay of interior surface using addition of aggregate
-
ARDEX RA 146
Blindside Concrete Crack Injection Epoxy Gel
- Structural crack repair of medium to large cracks
- Pressure injection for cracks from 6mm to 10mm
-
ARDEX RA 56
Low-Viscosity Rigid Hybrid Polyurethane Crack & Spall Repair
- Cures stronger than concrete
- Ultra Low Viscosity - Offers deep penetration into cracks
-
ARDEX Injection T-Port
Injection Ports for ARDEX Crack Injection Range
More projects in Residential and Office Building
-
AURA, Sydney
This contemporary luxury apartment project highlights trusted performance and industry-leading service and warranty
-
The Bakery, Newtown, Sydney
Award winning complete reconfiguration, restoration and redesign of two buildings
-
Holiday Inn Express Hotel – VIC
312 bathroom pods
-
Iglu Student Accommodation – VIC
594 bathroom pods with six different typologies
-
Mercure Hotel – VIC
166 bathroom pods
-
Midnight Hotel – ACT
183 architecturally designed bathroom pods
-
Vibe Hotel – TAS
132 architecturally designed bathroom pods
-
West Village – West End QLD
Office suites and apartments across multiple residential towers
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
Crystallbrook Bailey
Crystalbrook Bailey, Cairns, QLD (Luxury Hotel & Residences)
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
North Bondi Residential Apartments, Sydney
ARDEX concrete repair system specified for seaside residential block
-
Hitch Property Constructions – Waterproofing Refurbishment
ARDEX waterproofing membrane installed in bathroom refurbishment
-
74 Pirie Street, Adelaide
ARDEX waterproofing system specified for roof terrace area
-
Cairns Corporate Tower, Cairns
ARDEX system specified to rejuvenate a building that posed unique challenges
-
Heirloom Apartments, Fremantle
ARDEX waterproofing and tiling systems used in heritage listed building.
-
The Elan, Sydney
Complete façade overhaul using SystemARDEX
-
The Hub Apartments, Richmond
The Hub was completed using a full System ARDEX solution.
-
Sandgate Apartments, 51 Ashburner St, Manly
ARDEX render and waterproofing system specified for unique, beach-side façade restoration.
-
Oracle Apartments, Broadbeach
SystemARDEX specified in large redevelopment project.
-
Ocean Marina Pointe Apartments, Mandurah
ARDEX adhesive used in Mandurah apartments upgrade
-
Residential Apartments, St Peters
500sqm of ARDEX TPO used to fix leaks
-
One Eleven St Georges Terrace, Perth
Replacement of waterproofing membrane
-
Old Parliament House, Canberra
ARDEX products were specified and used throughout the project
-
Lure Apartments, Nelson Bay
ARDEX sound proofing system used in new prestigious development
-
Hoppers Crossing Warehouse
Structural and cosmetic repair to concrete tilt panels.
-
Elevation Apartments, Perth
ARDEX System used in prestigious development right in the heart of Perth’s CBD
-
215 Adelaide Street, Brisbane
Refurbishment of office tower complex
-
Government Building, 1 William Street, Brisbane
ARDEX binder and screed used to repair damage to high traffic area