Residential and Office Building
Projects
ARDEX binder and screed used to repair damage to high traffic area
Government Building, 1 William Street, Brisbane
An ARDEX system was used to repair surface damage to part of the carpark entry ramp
Government Building, 1 William Street, Brisbane
The new Queensland Government Executive building at 1 William Street, Brisbane currently under construction by Brookfield Multiplex Australasia was experiencing surface damage to part of the carpark entry ramp.
For this reason, a topping stronger than the original concrete was required with the ARDEX epoxy screed being selected by Master Floor Preparers (Qld) Pty Ltd as the most suitable system for this application.
The area to be covered was located in the transition zone to the carpark level at the base of the ramp, approximately 6 metres long by 1.6 metres wide and 35 mm thick.
ARDEX Abapoxy was used as the binder for the topping screed, making up approximately 10% of the mixed material. The filler used was ARDEX A 38 Gravel mix, 0-4mm size. This consistency provided close packing that was required so the topping is better able to resist the anticipated loads, although the mix was subject to the availability of these sand sizes and some variation in both sand size and mix ratio was possible. In addition, the sand had to be both washed and dried.
The binder mix consisted of 2 volumes of Abapoxy Part A with 1 volume of Abapoxy Part B mixed together to achieve a homogenous colour. The blended filler sand was added and mixed with a mechanical mixer to achieve a slump free mortar to ensure all the sand was coated with the epoxy binder.
The concrete had to be dry and mechanically prepared to remove all contaminants such as curing compounds and laitance, in addition to being vacuumed to remove any dust.
The procedure was to apply a bond coat of ARDEX Abapoxy with a brush or roller to achieve a uniform thin coating over the prepared concrete immediately prior to placement of the epoxy mortar.
Puddles were brushed out of the epoxy resin bond coat prior to placement of the epoxy screed mortar, the epoxy mortar had to be compacted during placement to remove air pockets. It was then left to harden overnight prior to allowing access to pedestrian traffic, as well as allowing 7 days for the screed to fully cure before allowing vehicular traffic.
More projects in Residential and Office Building
-
AURA, Sydney
This contemporary luxury apartment project highlights trusted performance and industry-leading service and warranty
-
The Bakery, Newtown, Sydney
Award winning complete reconfiguration, restoration and redesign of two buildings
-
Holiday Inn Express Hotel – VIC
312 bathroom pods
-
Iglu Student Accommodation – VIC
594 bathroom pods with six different typologies
-
Mercure Hotel – VIC
166 bathroom pods
-
Midnight Hotel – ACT
183 architecturally designed bathroom pods
-
Vibe Hotel – TAS
132 architecturally designed bathroom pods
-
West Village – West End QLD
Office suites and apartments across multiple residential towers
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
Crystallbrook Bailey
Crystalbrook Bailey, Cairns, QLD (Luxury Hotel & Residences)
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
North Bondi Residential Apartments, Sydney
ARDEX concrete repair system specified for seaside residential block
-
Hitch Property Constructions – Waterproofing Refurbishment
ARDEX waterproofing membrane installed in bathroom refurbishment
-
74 Pirie Street, Adelaide
ARDEX waterproofing system specified for roof terrace area
-
Cairns Corporate Tower, Cairns
ARDEX system specified to rejuvenate a building that posed unique challenges
-
Heirloom Apartments, Fremantle
ARDEX waterproofing and tiling systems used in heritage listed building.
-
The Elan, Sydney
Complete façade overhaul using SystemARDEX
-
The Hub Apartments, Richmond
The Hub was completed using a full System ARDEX solution.
-
Sandgate Apartments, 51 Ashburner St, Manly
ARDEX render and waterproofing system specified for unique, beach-side façade restoration.
-
Oracle Apartments, Broadbeach
SystemARDEX specified in large redevelopment project.
-
Ocean Marina Pointe Apartments, Mandurah
ARDEX adhesive used in Mandurah apartments upgrade
-
Residential Apartments, St Peters
500sqm of ARDEX TPO used to fix leaks
-
One Eleven St Georges Terrace, Perth
Replacement of waterproofing membrane
-
Old Parliament House, Canberra
ARDEX products were specified and used throughout the project
-
Lure Apartments, Nelson Bay
ARDEX sound proofing system used in new prestigious development
-
Hoppers Crossing Warehouse
Structural and cosmetic repair to concrete tilt panels.
-
Elevation Apartments, Perth
ARDEX System used in prestigious development right in the heart of Perth’s CBD
-
215 Adelaide Street, Brisbane
Refurbishment of office tower complex
-
Government Building, 1 William Street, Brisbane
ARDEX binder and screed used to repair damage to high traffic area