Waterproofing
Projects
Springs Day Spa & Fitness Centre, Noosa
INSTALLER: Thorburn Tiling Pty Ltd M&M Waterproofing Contractors & Sales
BUILDER: Starco Developments Pty Ltd.
ARCHITECT: Alan Starkey & Associates
CHALLENGES:
High quality materials & finishes needed to match the expectations for the $400 million five-star resort (1,030,000 m2 / 11,087,190 ft2)
Areas with large temperature fluctuations caused by infrared heating systems
Fear of erosion to specialized flooring materials from underwater jets
Use of high concentration chemicals with a history of destroying Portland cement structures
Areas with heavy gym equipment
PROBLEMS:
When Noosa Springs Resort decided to upgrade to a luxury five-star venue, only top performing materials would ensure the prevention of flooring failures in their state of the art facilities.
The fitness centre includes heavy exercise equipment & free weights. Therefore, the floor had to be durable to withstand the weight of the equipment. Onsite spa amenities include infrared saunas, steam rooms, blitz showers, a HydroMassage pool & large floating pools.
Each of these features created demanding challenges for the builders, as flexible & strong products were necessary to ensure a quality & long lasting installation.
SOLUTION:
To prepare the new concrete for tile and stone applications, installers used ARDEX WPM 265 Water Based Primer. ARDEX WPM 265 is an acrylic primer system that creates a positive bond between substrates & water- based coatings.
ARDEX WPM 300 Water Based Epoxy Membrane was used because it has superior water resistance & prevents efflorescence while withstanding hydrostatic pressure. It provides excellent adhesion to most substrates, including damp surfaces & freshly laid concrete, & it can be used as a one coat primer for other applied finishes like ARDEX waterproofing membranes & tiling adhesives. ARDEX WPM 300 is also safe for potable drinking water, removing risk of water contamination from materials in the many resort pool areas.
Next, ARDEX WPM 002 Two Component Undertile Waterproofing Membrane was applied. Recognized as one of the fastest drying acrylic membranes on the market, it can be tiled within 16 to 24 hours at ambient temperatures of 23˚C. Its advanced acrylic polymer technology makes it completely resistant to re emulsification.
ARDEX STS 8 Superior Tensile Strength Tile Adhesive was chosen because of its improved adhesion of heavy, large-format wall tiles otherwise prone to lipping and slumping. In a five-star resort, it was crucial that floor tile and wall treatments were not only functional but visually appealing. When necessary, ARDEX E 90 Mortar Admix was used to guarantee the adhesive was water repellent for resort showers and pools.
To finish the job, ARDEX ABAPOXY High Performance Epoxy Adhesive and Grout was selected for its strong resistance to harsh chemicals. This product was developed by ARDEX for applications requiring strict hygiene standards. It is completely solvent-free and suitable for walls and floors. Starco Developments Pty Ltd. selected ARDEX Australia to supply numerous products for the project that would perform well, provide longevity and expedite the installation process.
ARDEX products contributed to the successful completion of a world class standard in the Noosa Springs Golf & Spa Resort.
Products Specified for this project
-
ARDEX WPM 265
Water Based Primer
- Creates a positive bond between the substrate and most water based coatings
- Can be used on substrates like new and old concrete, timber and compressed fibre boards
-
ARDEX WPM 300
Water-Based Epoxy
- Compliant to AS/NZS4020 - Potable Drinking Water
- Compatible with damp surfaces and green concrete
-
ARDEX WPM 002
Two Component Waterproofing Membrane
- Compliant to AS4858 & AS4654
- Excellent durability and elongation performance
-
ARDEX E 90
Admix for Cement-Based Tile Adhesives
- Improves adhesion and imparts flexibility
- Provides a water repellent mortar – when tiling in showers, swimming pools
More projects in Waterproofing
-
Queen Elizabeth Hospital, Adelaide
Highly adaptable design, accommodating future technological advancements and healthcare needs
-
Australian Bragg Centre SAHMRI 2, Adelaide
State-of-the-art medical research facility
-
AURA, Sydney
This contemporary luxury apartment project highlights trusted performance and industry-leading service and warranty
-
Wai Ariki Hot Springs and Spa, Lake Rotorua, New Zealand
Luxury hot springs and spa situated on captivating shores
-
The Bakery, Newtown, Sydney
Award winning complete reconfiguration, restoration and redesign of two buildings
-
Nan Tien Temple, NSW
Largest Buddhist temple in the southern hemisphere
-
Midland Hospital – Bellevue, WA
245 custom built bathroom pods
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
SCEGGS – Redlands Senior Campus
This multi-stage redevelopment involved a New Learning Hub at one of Australia’s leading grammar schools.
-
Little Lane Early Learning Centre, Manly
ARDEX waterproofing system specified for building located in unique location
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Austin Apartment Pool Refurbishment, South Brisbane
ARDEX system specified to refurbish tiles that have lost adhesion in a pool
-
Hitch Property Constructions – Waterproofing Refurbishment
ARDEX waterproofing membrane installed in bathroom refurbishment
-
The Greek Orthodox Cathedral of Saint Sophia, Sydney
Heritage listed cathedral in Sydney utilises ARDEX system for complete remedial work
-
Creative Quarter Cycle Hub, Curtin University, Perth
Australian University develops bicycle hub comprising of a unique green roof
-
Garden Island Naval Base, Sydney
ARDEX WeldTec membrane specified for below ground project
-
Perth Children’s Hospital
ARDEX system specified for high-profile Government project.
-
Optus Stadium, Perth
SystemARDEX specified for high end Government project
-
Heirloom Apartments, Fremantle
ARDEX waterproofing and tiling systems used in heritage listed building.
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
The Elan, Sydney
Complete façade overhaul using SystemARDEX
-
MYER Shopping Centre, Cairns
ARDEX system specified for 10,000m of timber flooring to be laid at Myer Cairns.
-
Dubai Mall, Dubai
ARDEX System recommended for one of the largest retail shopping malls in the world - Dubai Mall.
-
The Hub Apartments, Richmond
The Hub was completed using a full System ARDEX solution.
-
Sandgate Apartments, 51 Ashburner St, Manly
ARDEX render and waterproofing system specified for unique, beach-side façade restoration.
-
Oracle Apartments, Broadbeach
SystemARDEX specified in large redevelopment project.
-
University Hospital, Gold Coast
The new 750 bed hospital is one of the largest public health projects
-
Paediatric Hospital, Melbourne
World-class paediatric hospital went under construction in Melbourne
-
Airport, Newcastle
1600 sqm of natural stone laid using ARDEX adhesives
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
MYER Building, Launceston
ARDEX TPO roofing membrane used to repair leaking roof at the Myer building
-
Residential Apartments, St Peters
500sqm of ARDEX TPO used to fix leaks
-
One Eleven St Georges Terrace, Perth
Replacement of waterproofing membrane
-
Old Parliament House, Canberra
ARDEX products were specified and used throughout the project
-
Lure Apartments, Nelson Bay
ARDEX sound proofing system used in new prestigious development
-
Elevation Apartments, Perth
ARDEX System used in prestigious development right in the heart of Perth’s CBD
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Te Wharewaka O Poneke, Wellington
1000 sq. metres of 1.5mm Dark Grey Butynol® was used for this significant arts venue.
-
The University of New South Wales, Sydney
An ARDEX TPO Roofing Membrane was used for a 1500 sq. metre roof area
-
Science Centre, Brisbane
The ARDEX range of compatible technologies were used in this major redevelopment