Leisure
Projects
RACV Royal Pines Golf Resort, Gold Coast
A premier world-class resort with a steadfast commitment to energy conservation had to work closely with suppliers and builders to overcome some unique hurdles during its recent refurbishments.
The RACV Royal Pines Golf Resort on the Gold Coast undertook an extensive upgrade in which the 27 hole golfing resort was elevated to world class standard.
Key points of consideration during the design and build process were the area’s Zone B grading (second highest wind zone in Australia); a commitment to minimising ongoing energy usage; and a need to continue operation of the resort throughout the refurbishment process.
The roof of the main 21 storey tower building required a new roofing membrane as the existing membrane – bitumen sheet over-coated with a liquid acrylic membrane – was exhibiting early signs of failure with blistering and some cracking appearing.
Specifications required a new membrane that could be installed over the existing membrane – to negate the need for removal of the existing membrane (a process that would present an element of risk to guests and employees of the resort). The membrane would also have to be able to withstand high wind speeds, consistent with its Zone B grading, while contributing to the ongoing reduction in energy consumption.
ARDEX Australia devised a system whereby the ARDEX TPO (Thermoplastic Polyolefin) membrane would be installed using a mechanical fixing technique that would exceed the standards required for the possible high wind uplift pressures of the area.
Key aspects to the specification of the ARDEX TPO membrane were its solar reflectance of a significant 79 per cent – a factor that would reduce the heat absorbed by the building, which is in a sub tropical location, and therefore reduce the energy required to cool the building.
Other factors making the ARDEX membrane the superior option were its extended service life, its ease of installation over the existing membrane and its exceptional sustainability properties.
The TPO membrane was used to cover a roof area of 600 square metres and has a projected lifespan of up to 20 years. Other factors making the ARDEX membrane the superior option were its extended service life, its ease of installation over the existing membrane and its exceptional sustainability properties.
The ARDEX TPO membrane was used to cover a roof area of 600 square metres and has a projected lifespan of up to 20 years.
All aspects of the ARDEX TPO membrane installation complied with the extremely high environmental sustainability standards set by the owners of the development.
Environmentally the ARDEX TPO waterproofing membrane has some definite advantages – its chlorine-free, non-halogenated and plasticizer-free formulation, in combination with the hotair welded seaming method, produce no emissions harmful to the environment. The membrane can also be easily recycled and has a lower manufacturing footprint than comparable systems.
More projects in Leisure
-
Nan Tien Temple, NSW
Largest Buddhist temple in the southern hemisphere
-
Burj Khalifa – Middle East
Burj Khalifa is the tallest building in the world
-
Holiday Inn Express Hotel – VIC
312 bathroom pods
-
Iglu Student Accommodation – VIC
594 bathroom pods with six different typologies
-
Mercure Hotel – VIC
166 bathroom pods
-
West Village – West End QLD
Office suites and apartments across multiple residential towers
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
Crystallbrook Bailey
Crystalbrook Bailey, Cairns, QLD (Luxury Hotel & Residences)
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
Miami Aquatic Centre, Miami, Gold Coast
Renovation on 40+ year aquatic facility installed with ARDEX tiling system
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Austin Apartment Pool Refurbishment, South Brisbane
ARDEX system specified to refurbish tiles that have lost adhesion in a pool
-
Optus Stadium, Perth
SystemARDEX specified for high end Government project
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Opera House Western Foyer, Sydney
ARDEX adhesive, grout and primer used at Sydney Opera House
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
Lightning Ridge Olympic Pool
ARDEX tiling system specified for pool complex renovation
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
The Vibe Hotel, Canberra
5000 sq. metres of ARDEX tile adhesive was used for The Vibe Hotel