Leisure
Projects
Box Hill Pool Refurbishment
ARCHITECT: A1 Office Fitouts
CONTRACTOR: Bravada Building Services
Challenges:
The size of the project coupled with the tight timeframe resulted in various challenges for the contractor, Bravada Building Services. Firstly, the contractor was given only seven weeks to complete the pool refurbishment project, which is located between Spotlight and Anaconda in the Spotlight Retail Centre. In all, nine different ARDEX products were used, including 570sqm of WPM 002 Waterproofing Membrane and 540sqm of X 17 tile adhesive, FG 8 grout on the pool surrounds, change rooms, foyer and mosaic walls. Also used was 285sqm of WPM 405, an ARDEX additive that enhanced the strength of the screed.
ARDEX products were selected as they are completely compatible, easy to use, as well as being supported by a dedicated Technical Support Team and manufacturer’s guarantee.
Problem:
Bravada Building Services were confronted with a significant challenge as the pool surround was quiet shallow for the screed (minimum thickness and achieving minimum fall requirements 1:100). Due to the thickness issues and the Scyon installation patterns, Bravada Building Services decided to use a self-supporting screed which included a slip sheet with expanded metal reinforcing. ARDEX WPM 405 additive was also used to increase the compressive strength, ultimately giving the contractor’s peace of mind.
The tiling also resulted in a challenge due to tile choices and the layout of patterns. However, the reliability and consistency of ARDEX X 17 tile adhesive provided the contractors with the confidence they needed. ARDEX X 17 was installed in multiple locations and environments such as the pool deck surround, change rooms, showers and foyer areas.
Solution
With a project of this magnitude and complexity it was crucial that all products and techniques selected were not only suitable for the environment but were also compatible. Given the confidence in the ARDEX range of products, Bravada Building Services had no hesitation in using an ARDEX System for this project.
Unique Elements:
Without doubt, ARDEX WPM 002 and WPM 405 were the two key products that made this project such a success. However, ARDEX does not believe that their responsibility ends with the manufacture of innovative and specialist solutions. ARDEX’ Sales Representative, Brett O’Loughlin, provided Bravada Building Services with technical support before, during and after the installation. The support provided from the ARDEX Team, including in-depth training on a huge variety of products and techniques all influenced the outcome of this installation.
Products Specified for this project
-
ARDEX WPM 405
SBR Polymer Additive
- Multi-purpose liquid polymer additive
- Can greatly improve bond strength, flexibility, and workability
-
ARDEX X 17
Flexible Non-Slump Wall and Floor Tile Adhesive
- Non slump – ideal for large format and heavy tiles
- Great workability with low sand content
-
ARDEX FG 8
Flexible Coloured Grout for Tile Joints 1 to 8 mm Wide
- Strong uniform colour - reduces efflorescence
- Polymer fortified – reduces likelihood of cracking
-
ARDEX WPM 002
Two Component Waterproofing Membrane
- Compliant to AS4858 & AS4654
- Excellent durability and elongation performance
More projects in Waterproofing
-
Queen Elizabeth Hospital, Adelaide
Highly adaptable design, accommodating future technological advancements and healthcare needs
-
Australian Bragg Centre SAHMRI 2, Adelaide
State-of-the-art medical research facility
-
AURA, Sydney
This contemporary luxury apartment project highlights trusted performance and industry-leading service and warranty
-
Wai Ariki Hot Springs and Spa, Lake Rotorua, New Zealand
Luxury hot springs and spa situated on captivating shores
-
The Bakery, Newtown, Sydney
Award winning complete reconfiguration, restoration and redesign of two buildings
-
Nan Tien Temple, NSW
Largest Buddhist temple in the southern hemisphere
-
Midland Hospital – Bellevue, WA
245 custom built bathroom pods
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
SCEGGS – Redlands Senior Campus
This multi-stage redevelopment involved a New Learning Hub at one of Australia’s leading grammar schools.
-
Little Lane Early Learning Centre, Manly
ARDEX waterproofing system specified for building located in unique location
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Austin Apartment Pool Refurbishment, South Brisbane
ARDEX system specified to refurbish tiles that have lost adhesion in a pool
-
Hitch Property Constructions – Waterproofing Refurbishment
ARDEX waterproofing membrane installed in bathroom refurbishment
-
The Greek Orthodox Cathedral of Saint Sophia, Sydney
Heritage listed cathedral in Sydney utilises ARDEX system for complete remedial work
-
Creative Quarter Cycle Hub, Curtin University, Perth
Australian University develops bicycle hub comprising of a unique green roof
-
Garden Island Naval Base, Sydney
ARDEX WeldTec membrane specified for below ground project
-
Perth Children’s Hospital
ARDEX system specified for high-profile Government project.
-
Optus Stadium, Perth
SystemARDEX specified for high end Government project
-
Heirloom Apartments, Fremantle
ARDEX waterproofing and tiling systems used in heritage listed building.
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
The Elan, Sydney
Complete façade overhaul using SystemARDEX
-
MYER Shopping Centre, Cairns
ARDEX system specified for 10,000m of timber flooring to be laid at Myer Cairns.
-
Dubai Mall, Dubai
ARDEX System recommended for one of the largest retail shopping malls in the world - Dubai Mall.
-
The Hub Apartments, Richmond
The Hub was completed using a full System ARDEX solution.
-
Sandgate Apartments, 51 Ashburner St, Manly
ARDEX render and waterproofing system specified for unique, beach-side façade restoration.
-
Oracle Apartments, Broadbeach
SystemARDEX specified in large redevelopment project.
-
University Hospital, Gold Coast
The new 750 bed hospital is one of the largest public health projects
-
Paediatric Hospital, Melbourne
World-class paediatric hospital went under construction in Melbourne
-
Airport, Newcastle
1600 sqm of natural stone laid using ARDEX adhesives
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
MYER Building, Launceston
ARDEX TPO roofing membrane used to repair leaking roof at the Myer building
-
Residential Apartments, St Peters
500sqm of ARDEX TPO used to fix leaks
-
One Eleven St Georges Terrace, Perth
Replacement of waterproofing membrane
-
Old Parliament House, Canberra
ARDEX products were specified and used throughout the project
-
Lure Apartments, Nelson Bay
ARDEX sound proofing system used in new prestigious development
-
Elevation Apartments, Perth
ARDEX System used in prestigious development right in the heart of Perth’s CBD
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Te Wharewaka O Poneke, Wellington
1000 sq. metres of 1.5mm Dark Grey Butynol® was used for this significant arts venue.
-
The University of New South Wales, Sydney
An ARDEX TPO Roofing Membrane was used for a 1500 sq. metre roof area
-
Science Centre, Brisbane
The ARDEX range of compatible technologies were used in this major redevelopment