Leisure
Projects
Q1 Surfers Paradise, Brisbane
Developed by the Sunland Group, the tower boasts 526 ultra smart apartments. The Q1 project required a Comprehensive range of technologically advanced and integrated products.
ARDEX was selected as exclusive suppliers of all Q1’s tile adhesives, soundproofing requirements, and grouts to be installed by Klaus Tiling. For critical high traffic areas requiring a heavy duty leveling product ARDEX K 15 was used.
One of the major tiling hurdles was the potential lipping of the 600 x 600mm, 20mm thick limestone floor tiles with conventional flexible adhesives. (Lipping or uneven tile heights is aesthetically unappealing and a trip hazard). The rheology of ARDEX X 56 – a new generation, highly flexible adhesive – overcame problems with ‘lipping’. Used over the company’s Soundproof Underlay, it also helps improve impact sound resistance. For areas requiring an adhesive with high tensile strength (and superior non slump), ARDEX STS 8 was used.
Grouts and silicones colour matched to blend in with the tiles provided the final touches. Walls and floors were grouted with Flexgrout Ultrasmooth. For tile joints subject to the stresses of differential movement, ARDEX SE silicone provided a waterproof, permanently elastic, UV and mould-resistant seal.
ARDEX K 15 – a globally recognised leader in floor levelling product category – was specified for critical areas e.g. foyers, lift lobbies. With its unique Ardurapid effect, ARDEX K 15 allows impervious vinyl coverings to be laid after only 16 hours, regardless of bed thickness.
The comprehensive and integrated nature of the ARDEX portfolio of products, plus the company’s wealth of locally-based technical expertise, has been acknowledged as a factor in the successful, on-time completion of the world’s tallest residential tower.
Products Specified for this project
-
ARDEX K 15 Microtec
Rapid-Drying Self-Levelling Smoothing Compound
- Ardurapid technology with Microfibre reinforcement
- Feather edge to any thickness in one application
-
ARDEX X 56
Highly Flexible Tile Adhesive
- Fast setting - grout after 4 hours
- Suitable for early age concrete - tile sooner over concrete (after 7 days) and screeds/renders (after 16 hours)
-
ARDEX SE
Flexible Sealant for use in Tile Movement Joints
- Flexible sealant for use in tile movement and connecting joints
- Elastic – withstands 25% total movement of original joint width
More projects in QLD
-
West Village – West End QLD
Office suites and apartments across multiple residential towers
-
Crystallbrook Bailey
Crystalbrook Bailey, Cairns, QLD (Luxury Hotel & Residences)
-
Miami Aquatic Centre, Miami, Gold Coast
Renovation on 40+ year aquatic facility installed with ARDEX tiling system
-
Austin Apartment Pool Refurbishment, South Brisbane
ARDEX system specified to refurbish tiles that have lost adhesion in a pool
-
Mercedes Benz Autohaus, Newstead
ARDEX system specified for unique 32,000 sqm auto dealership
-
Cairns Corporate Tower, Cairns
ARDEX system specified to rejuvenate a building that posed unique challenges
-
Harbour Town Eats, Gold Coast
External tiling system specified in the worlds largest installation of Flexbone.
-
MYER Shopping Centre, Cairns
ARDEX system specified for 10,000m of timber flooring to be laid at Myer Cairns.
-
Oracle Apartments, Broadbeach
SystemARDEX specified in large redevelopment project.
-
University Hospital, Gold Coast
The new 750 bed hospital is one of the largest public health projects
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
215 Adelaide Street, Brisbane
Refurbishment of office tower complex
-
Government Building, 1 William Street, Brisbane
ARDEX binder and screed used to repair damage to high traffic area
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
Science Centre, Brisbane
The ARDEX range of compatible technologies were used in this major redevelopment