Leisure
Projects
Optus Stadium, Perth
APPLICATOR: Vercon
BUILDER: Brookfield Multiplex
A high-profile Government project located in Perth, Western Australia, the new Optus Stadium is a 60,000-seat venue that hosts a variety of sports (Australian Rules, Rugby League and Soccer, through to international and domestic cricket) and entertainment/concerts.
Unique Elements
With such a large stadium, 30,000 square metres of tiling was to be completed on a strict deadline. There were multiple areas that needed to be tiled and/or waterproofed, ranging from wet area floors and walls, training and recovery facilities, kitchens and food prep, bars in executive lounges/boxes, lift lobbies and main foyer areas. Being a Government backed project, the finished product also needed to reflect a high standard.
Solution
With indoor and outdoor, and wet and dry areas to be tiled and waterproofed, the builders required a specification in which products could perform in a variety of conditions and uses as well as speed up and ease the process of installation in order to meet that deadline.
ARDEX X 10 and X 18 wall and floor tile adhesive were chosen due to their flexible and non-slump properties. ARDEX X 18 was ideal for the larger and heavier tiles. ARDEX X 10, suitable for wet areas, contains specially developed fibres that add strength to the tiled area, ensuring a strong and consistent finish.
ARDEX WPM 002 two-part undertile waterproofing membrane was specified due to its rapid drying time. Tiling could commence 16-24 hours after application which helped ensure a quick turnaround to meet the strict deadline.
Products Specified for this project
-
ARDEX X 18
Fibre Reinforced Flexible Non Slump Wall and Floor Tile Adhesive
- Fibre reinforced for extra strength and peace of mind
- Excellent workability with low sand content
-
ARDEX X 10
Flexible Non Slump Wall and Floor Tile Adhesive
- Non slump – ideal for large format and heavy tiles
- Extended open time
-
ARDEX WPM 002
Two Component Waterproofing Membrane
- Compliant to AS4858 & AS4654
- Excellent durability and elongation performance
More projects in Leisure
-
Nan Tien Temple, NSW
Largest Buddhist temple in the southern hemisphere
-
Burj Khalifa – Middle East
Burj Khalifa is the tallest building in the world
-
Holiday Inn Express Hotel – VIC
312 bathroom pods
-
Iglu Student Accommodation – VIC
594 bathroom pods with six different typologies
-
Mercure Hotel – VIC
166 bathroom pods
-
West Village – West End QLD
Office suites and apartments across multiple residential towers
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
Crystallbrook Bailey
Crystalbrook Bailey, Cairns, QLD (Luxury Hotel & Residences)
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
Miami Aquatic Centre, Miami, Gold Coast
Renovation on 40+ year aquatic facility installed with ARDEX tiling system
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Austin Apartment Pool Refurbishment, South Brisbane
ARDEX system specified to refurbish tiles that have lost adhesion in a pool
-
Optus Stadium, Perth
SystemARDEX specified for high end Government project
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Opera House Western Foyer, Sydney
ARDEX adhesive, grout and primer used at Sydney Opera House
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
Lightning Ridge Olympic Pool
ARDEX tiling system specified for pool complex renovation
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
The Vibe Hotel, Canberra
5000 sq. metres of ARDEX tile adhesive was used for The Vibe Hotel