The Greek Orthodox Cathedral of Saint Sophia, Sydney
CONSULTANT: BellMont Façade Engineering
REMEDIAL BUILDER: ARA Building Services
The Greek Orthodox Cathedral of Saint Sophia is a heritage listed church located in Paddington, NSW. Having been consecrated in 1927, the church has a storied history as the first Greek Orthodox Cathedral in the Southern Hemisphere and playing an important role in the settlement of newly arrived Greek immigrants in Sydney.
Unique Elements
With the cathedral being 93 years old at the time and being exposed to multiple elements for a lengthy period, there was significant accumulated structural damage. Parts of the building were crumbling, and large cracks had appeared.
The front façade had suffered from reinforcement corrosion with large sections of the concrete mix completely saturated, resulting in corrosion of the steel reinforcement. The left and right corners of the upper level frieze shifted by up to 20mm. And the bedding of the top moulds/corbel had delaminated. The supporting walls which underpinned the entablature were supported off a base slab tied into the structure – forming an intricate gravity based system to support the main wall and entablature.
Saint Sophia was also heritage listed by the NSW Government in 2015, and as such, any work was required to be undertaken in accordance with the Burra Charter. This meant that no alterations to the façade of the building were allowed, other than to reinstate original features.
Solution
BellMont Façade Engineering diagnosed, designed and specified the materials and systems required for the project. As a NSW State Heritage listed item, the design of the solution absorbed extensive time and detailing to maximise the use of existing fabric. All materials that were required for this restoration were approved by BellMont Façade Engineering, ensuring that the Burra Charter was at the forefront of the restoration project. BellMont Façade Engineering designed and supervised installation of the support for the front façade – which was 8 metres above ground level – during the sequential repair of heavily corded reinforcing bars and spalled concrete of the front and rear face of the main entrance wall. This allowed for the front and rear faces of the wall to be repaired separately.
The wall was poured in two separate pours using ARDEX BR 460 FLOW, a high performance, flowable, structural repair micro-concrete. Approximately 9,000 litres of concrete repair was undertaken using the ARDEX BR 460 FLOW – structural grade, flowable repair mortar.
While the elevated wall was being repaired, a propping system was designed to support the entablature – 8 metres above the main entrance portico. The entablature was repaired with ARDEX BR 345, a Microtec® fibre-reinforced structural concrete patching and repair mortar which contains an active corrosion inhibitor.
Approximately 200 lineal metres of ARDEX WPM 1000 WeldTec External Waterproofing Membrane were applied to waterproof the corbels on the building, with the membrane made up of a synthetic rubber with properties which resist ageing from heat, sunlight and ozone. The system was then completed with a liquid membrane coating to match the remainder of the church façade.
800 square metres of ARDEX WPM 310 External Façade and Roof Membrane was applied to the façade of the cathedral. ARDEX WPM 310 is a tough, UV stable and flexible membrane that is designed specifically as a general-purpose membrane for exposed wall and roof waterproofing.
To help prevent further cracking in the structure, 30 lineal metres of Rhino Carbon Fibre Crack Stitching was installed with ARDEX RA 88 PLUS (Multi-Purpose Epoxy Repair Adhesive). Once installed, the Rhino Concrete Crack Lock permanently bonds both sides of the crack together.
Products Specified for this project
-
ARDEX WPM 1000
WeldTecTM Versatile Waterproofing Membrane
- Compliant to AS4654, AS4858 and AS2904
- Flood testing / tiling / screeding can begin 60 minutes after membrane installation
-
ARDEX WPM 310
General Purpose Coating For Exposed Facade Applications
- Water based – safe to use, low odour and easy cleaning
- Excellent workability – easy, quick to apply
-
ARDEX RA 88 PLUS
Multi-Purpose Epoxy Repair Adhesive
- Non-sag - Perfect for overhead and vertical repairs
- High strength - Stronger than concrete > 55Mpa
-
ARDEX BR 460 Flow
High Performance, Flowable, Structural Micro Concrete
- Low resistivity
- Contains active corrosion inhibitor
-
ARDEX BR 345
High Resistivity Structural Concrete Patching and Repair Mortar
- High resistivity (>15,000 cm)
- Contains active corrosion inhibitor
-
Concrete Crack Lock
Carbon-Fibre Crack Bridging Stitch
- High Strength
- Non-Corrosive
More projects in Waterproofing
-
Wai Ariki Hot Springs and Spa, Lake Rotorua, New Zealand
Luxury hot springs and spa situated on captivating shores
-
The Bakery, Newtown, Sydney
Award winning complete reconfiguration, restoration and redesign of two buildings
-
Nan Tien Temple, NSW
Largest Buddhist temple in the southern hemisphere
-
The Dubai Mall, Dubai
Dubai Mall is the world’s largest covered mall including a shark tank, an Olympic size skating rink, and theme park.
-
Midland Hospital – Bellevue, WA
245 custom built bathroom pods
-
DoubleTree by Hilton
DoubleTree by Hilton – Northbridge, WA
-
ADGE Hotel Refurbishment
ADGE Hotel Refurbishment (formerly Cambridge Hotel) – Surry Hills, NSW
-
The Towers & Ritz Carlton, Elizabeth Quay
A New Iconic Building For Perth's Skyline
-
SCEGGS – Redlands Senior Campus
This multi-stage redevelopment involved a New Learning Hub at one of Australia’s leading grammar schools.
-
Little Lane Early Learning Centre, Manly
ARDEX waterproofing system specified for building located in unique location
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Austin Apartment Pool Refurbishment, South Brisbane
ARDEX system specified to refurbish tiles that have lost adhesion in a pool
-
Hitch Property Constructions – Waterproofing Refurbishment
ARDEX waterproofing membrane installed in bathroom refurbishment
-
The Greek Orthodox Cathedral of Saint Sophia, Sydney
Heritage listed cathedral in Sydney utilises ARDEX system for complete remedial work
-
Creative Quarter Cycle Hub, Curtin University, Perth
Australian University develops bicycle hub comprising of a unique green roof
-
Garden Island Naval Base, Sydney
ARDEX WeldTec membrane specified for below ground project
-
Perth Children’s Hospital
ARDEX system specified for high-profile Government project.
-
Optus Stadium, Perth
SystemARDEX specified for high end Government project
-
Heirloom Apartments, Fremantle
ARDEX waterproofing and tiling systems used in heritage listed building.
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
The Elan, Sydney
Complete façade overhaul using SystemARDEX
-
MYER Shopping Centre, Cairns
ARDEX system specified for 10,000m of timber flooring to be laid at Myer Cairns.
-
Dubai Mall, Dubai
ARDEX System recommended for one of the largest retail shopping malls in the world - Dubai Mall.
-
The Hub Apartments, Richmond
The Hub was completed using a full System ARDEX solution.
-
Sandgate Apartments, 51 Ashburner St, Manly
ARDEX render and waterproofing system specified for unique, beach-side façade restoration.
-
Oracle Apartments, Broadbeach
SystemARDEX specified in large redevelopment project.
-
University Hospital, Gold Coast
The new 750 bed hospital is one of the largest public health projects
-
Paediatric Hospital, Melbourne
World-class paediatric hospital went under construction in Melbourne
-
Airport, Newcastle
1600 sqm of natural stone laid using ARDEX adhesives
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
MYER Building, Launceston
ARDEX TPO roofing membrane used to repair leaking roof at the Myer building
-
Residential Apartments, St Peters
500sqm of ARDEX TPO used to fix leaks
-
One Eleven St Georges Terrace, Perth
Replacement of waterproofing membrane
-
Old Parliament House, Canberra
ARDEX products were specified and used throughout the project
-
Lure Apartments, Nelson Bay
ARDEX sound proofing system used in new prestigious development
-
Elevation Apartments, Perth
ARDEX System used in prestigious development right in the heart of Perth’s CBD
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Te Wharewaka O Poneke, Wellington
1000 sq. metres of 1.5mm Dark Grey Butynol® was used for this significant arts venue.
-
The University of New South Wales, Sydney
An ARDEX TPO Roofing Membrane was used for a 1500 sq. metre roof area
-
Science Centre, Brisbane
The ARDEX range of compatible technologies were used in this major redevelopment